Installation and Maintenance
- Home
- /
- Installation and Maintenance
Installation
To avoid possible reflection differences (for metallic, special effect, naturAL and spectra colours), it is recommended to install the panels in the same direction as marked on the protective peel-off film. Colour variations may occur between panels originating from different production batches. To ensure colour consistency, the total requirement for a project should be placed in one order.
Protective Film
In order to avoid adhesive residues on the surface, caused by UV radiation, the protective film should be removed as soon as possible after the panels have been installed. Protective films and panel surfaces are not to be marked with inks (felt tips), adhesive tapes or stickers, as solvents or softeners can damage the painted surfaces. After installation, the protective film must be removed as quickly as possible, as the film which has been weathered on a long-term basis can only be removed with great difficulty.
Cleaning and Maintenance
The frequency of cleaning and the choice of a suitable cleaning agent depends largely on the location of the building and the condition of the panel surface. The cleaning can be carried out with water and a sponge or a soft brush. In case of severe soiling add a neutral detergent.
Storage / Handling
ALUCOBOND® should be protected against rain, dampness penetrating the panels and the build-up of condensation. It is recommended that panels of the same dimension and size must be stacked with a maximum stacking height of 6 pallets. Storage for more than 6 months should be avoided as removing the lm may not be easy. When stacking, do not lay anything between the panels to avoid imprints.
Recycling
ALUCOBOND® can be fully recycled, i.e. both the core material and the aluminium cover sheets can be recycled and used for the production of new material.